Knowing that emergency egress lighting specifications for new construction and retrofit projects include LED fixtures …Controlled Power Company have designed their inverters with a high peak overload capability to accommodate the inrush current from LED fixtures / drivers while the inverter is fed from the AC power source, or even while in battery mode!