Phase underground or overhead on 120V to 500kV circuits. Test without de-energizing lines. Balance loads to minimize system loss. Reduce safety hazards and damage to equipment. Identify and mark correct phasing for system mapping. Ensure substations’ connections are phase correct. Export results to GISwithout de-energizing power lines (120V to 500kV).